Abstract
This paper presents the results of a study of three very successful Hybrid * concrete projects. Supply chain analyses are described and, in the event, the situations found are typified as networks. Problem areas are identified together with various illustrations of good practice, with a particular stress on the necessity for intensive and effective informal communications. The particular problems attendant on the design side of the process, rooted in role confusion and a lack of design fixity are highlighted. This links to the suggestion that as the knowledge of Hybrid systems becomes better understood and is more fully communicated through codification then many of these problems should evaporate. That is, Hybrid can move from being a disruptive technology and become a sustaining technology for the industry and its clients.
Subject
Building and Construction,Civil and Structural Engineering
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献