Affiliation:
1. George Washington University, Washington, DC, USA
Abstract
In February 2014 at the WIPP transuranic waste repository in New Mexico, a drum erupted in fire. It exposed 22 people to radiation, shut down the underground facility for 35 months and cost the United States over a billion dollars. Heat and pressure had built up in the drum due to chemical reactions with an organic kitty litter, Swheat Scoop, which had been mistakenly added to it at Los Alamos National Laboratory, the birthplace of the atomic bomb. This article disrupts two prominent narratives: (a) that the accident was induced by a typographical error made after a waste packaging operations supervisor misheard ‘inorganic kitty litter’ as ‘an organic kitty litter’ during a meeting, and (b) that it was induced primarily by ‘mismanagement’ at WIPP, Los Alamos and the DOE’s New Mexico field offices. It does so by exploring how a series of overambitious political initiatives, fraught labor relationships, financialized subcontracting arrangements and US Department of Energy (DOE) performance incentives set the stage for Los Alamos’s notorious error by accelerating US waste packaging, shipping and repository emplacement rates beyond systemic capacity. Attention to operational temporalities shows how an often-overlooked nexus of schedule pressures, political-economic imperatives and regulatory breakdowns converged to modulate nuclear waste management workflows and, ultimately, trigger a radiological accident.
Funder
John D. and Catherine T. MacArthur Foundation
Subject
History and Philosophy of Science,General Social Sciences,History
Cited by
11 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献