Examining Contingency and Inflation Practices Within Several Departments of Transportation in the United States

Author:

Alsharef Abdullah1ORCID,Findley Daniel2ORCID,Jaselskis Edward3,Dudley Thomas2,Pyo Kihyun2,Yang Guangchuan2ORCID

Affiliation:

1. Civil Engineering Department, King Saud University, Riyadh, Saudi Arabia

2. Institute for Transportation Research and Education (ITRE), North Carolina State University, Raleigh, NC

3. Department of Civil, Construction, and Environmental Engineering, North Carolina State University, Raleigh, NC

Abstract

Transportation projects are notorious, among both the public and transportation professionals, for missing their intended cost and schedule targets as a result of project complexity and uncertainties. The significant discrepancy between cost estimates and final project costs remains a major concern for state Departments of Transportation (DOTs). Several risk factors, including estimation errors and price fluctuations, contribute to these discrepancies and are typically managed by adding a contingency to project estimates. Cost escalation can also result from inadequate adjustment for inflation in estimates, given the current economic environment and the lengthy duration of major transportation projects. This paper summarizes how several state DOTs apply contingencies to mitigate the impact of certain risks and adjust their State Transportation Improvement Program (STIP) revenues and costs to account for inflation. The study surveyed 13 state DOTs to understand how contingencies are applied to the three major components of transportation projects (construction, right of way, and utilities). Additionally, interviews were conducted with 15 state DOTs to understand how they address inflation, particularly as it pertains to the STIP process. The results indicate that most DOTs apply contingency allowances to their project estimates during the early project development and maintain some level of contingency allowance at the plans, specifications, and estimate (PS&E) stage. As for addressing inflation, most state DOTs include inflation of the project cost in the project estimates to the time of bid letting or year of expenditure. The findings of this study can benefit state DOTs that are reassessing their strategies for implementing contingency and inflation within their STIP.

Publisher

SAGE Publications

Reference30 articles.

1. U.S. Department of Transportation. State DOT’s Responsibilities. https://www.transportation.gov/civil-rights/civil-rights-awareness-enforcement/state-dots-responsibilities. Accessed July 27, 2023.

2. A Risk-Based Approach to Contingency Estimation in Highway Project Development

3. Underestimating Costs in Public Works Projects:Error or Lie?

4. Exploring the Relationships Between Project Complexity and Quality Management Approaches in Highway Construction Projects

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3