Critical Comparison of Progressive Design-Build and Construction Manager/General Contractor Project Delivery Methods

Author:

Gransberg Douglas D.1,Molenaar Keith R.2

Affiliation:

1. Gransberg & Associates, Inc., Norman, OK

2. College of Engineering, University of Colorado at Boulder, Boulder, CO

Abstract

Progressive design-build (PDB) is an emerging variation of alternative contracting methods (ACMs) in the highway construction industry. It is widely used in water/wastewater and airport projects, but it is new to federally-funded highway projects. A few state department of transportations (DOTs) have begun to experiment with the method, using their experience with qualification-based selection (QBS) and a subsequent negotiated construction price from construction manager/general contractor (CMGC) contracting. There has been little written that provides guidance to public highway agencies who are interested in implementing PDB. Therefore, the purpose of this paper is to first describe the mechanics of PDB project delivery to provide consistent foundation information from which DOTs can inform their decision as to when to use it. The paper also provides a comparative analysis of PDB with CMGC and finds that they are nearly identical with regard to format, differing only in whether the owner retains the design responsibility in CMGC or assigns it to the design-builder in PDB. It also finds that PDB is more appropriate than traditional design-build (DB) for projects in which the owner needs to engage the design-builder in the preliminary engineering and environmental permitting process.

Publisher

SAGE Publications

Subject

Mechanical Engineering,Civil and Structural Engineering

Cited by 26 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Implementation of Progressive Design-Build in Airport Capital Construction Projects;Transportation Research Record: Journal of the Transportation Research Board;2024-05-23

2. Multi-criteria decision support model for selecting the appropriate construction management firm;International Journal of Construction Management;2024-04-10

3. Analyzing the Impact of DB versus DBB on Cost Performance in Airport Development: A Data-Driven Approach;Construction Research Congress 2024;2024-03-18

4. Data-Driven Analysis of Progressive Design Build in Water and Wastewater Infrastructure Projects;Journal of Construction Engineering and Management;2024-01

5. Implementing Progressive Design Build: Enabling Legislation May Not Be Required;Journal of Legal Affairs and Dispute Resolution in Engineering and Construction;2023-11

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3