Concurrent Resource Allocation (CRA): A Heuristic for Multi-Project Scheduling with Resource Constraints in Concurrent Engineering

Author:

Kara S.1,Kayis B.1,Kaebernick H.1

Affiliation:

1. Department of Industrial Technology and Management, School of Mechanical and Manufacturing Engineering, University of New South Wales, Sydney, 2052, Australia

Abstract

Concurrent Engineering (CE) has gained immense popularity around the world as a means of accelerating product develop ment, reducing cost, and increasing quality. CE achieves this by overlapping tasks and executing them in parallel. Different and inde pendent surveys conclude that significant benefits can be achieved as a result of implementing CE. However, CE radically affects the way projects are managed due to the complexities and uncertainties caused by executing tasks with incomplete information. This re quires careful planning and organization prior to implementing CE projects, otherwise delays in project completion and deterioration in project performance may occur due to the uncertainties in the process. Although the literature suggests that one of the essential ele ments for successfully implementing CE is careful and detailed project planning, very little attention is devoted to addressing this prob lem. This is due to the fact that CE is a relatively new concept and product development projects could be extremely complex [9]. In practice, project managers try to address uncertainty and resource allocation in a multi-project environment by using traditional project management tools and techniques. In this paper, a new multi-project scheduling heuristic is developed and used to address the problem of resource constraint scheduling in a multi-project CE environment. This proposed multi-project scheduling heuristic considers the unique characteristics of CE projects such as concurrency and dual-level project management structure. The superior performance and capability of the proposed multi-project scheduling heuristic are demonstrated by applying them to a case study gathered from an Australian manufacturing firm. In addition, the applicability of the available multi-project scheduling heuristics to the CE environment is also investigated. It is concluded that the new multi-project scheduling heuristic performs better than traditional ones in terms of minimizing project completion time and optimizing resource utilization.

Publisher

SAGE Publications

Subject

Computer Science Applications,General Engineering,Modelling and Simulation

Cited by 10 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3