Affiliation:
1. College of Transportation, Jilin University, Jilin Changchun, China
2. College of Architecture, Xi’an University of Architecture and Technology, Xi'an, China
Abstract
In order to improve the efficiency of assembly line and optimize the layout, this paper presents a collaborative optimization model for a two-sided U-type assembly line and a novel design with p-l partition layout is proposed to minimize number of workstations without increasing the length of the assembly line. Considering the task orientation and time sequencing in cross-workstation, the mathematical model of two-sided U-type assembly line balancing problem is derived. A multi-level priority rule heuristic algorithm is developed to drive the optimization process. The multi-level priority rule heuristic algorithm, modified particle swarm optimization algorithm, and the bi-objective integer programming method are applied to 20 classic examples, respectively. The calculation results suggest that the optimal results of the proposed method account for 90%, which verifies the rationality of the collaborative optimization model and algorithm, and provides a useful reference for the modeling and solution of the two-sided U-type assembly line balancing problems.
Subject
Computer Science Applications,General Engineering,Modeling and Simulation
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献