Affiliation:
1. Department of Civil Engineering, Faculty of Civil and Earth Resources Engineering, Central Tehran Branch, Islamic Azad University, Tehran, Iran
2. School of Civil Engineering, Iran University of Science and Technology, Tehran, Iran
Abstract
Design coordination and clash detection are the most common and appreciated applications of three-dimensional modeling (3D modeling). In some projects, millions of clashes are detected including a large number of irrelevant clashes. The purpose of this research is to determine the priority of resolving clashes before the construction phase. In this research, the results of Autodesk Navisworks have been used to improve the process of clash detection. Also, this study attempts to use the fuzzy-AHP for weighting criteria and then, by presenting a relationship, to provide a basis to prioritizing clashes for their resolution and, finally, for identifying irrelevant clashes. This method has been tested on a real project, and the comparison of the expert opinions and the proposed method showed that applying the proposed relationship can identify important and irrelevant clashes. Practical application If clashes are not carefully detected in the design stage, project management components face a serious challenge. In this study, using the weight of clash elements and the degree of penetration of clash elements into each other, a logical and practical relationship is presented that improves the process of clash detection.
Subject
Building and Construction
Reference26 articles.
1. BIM Handbook
2. Khanzode A. An Integrated, Virtual Design and Construction and Lean (IVL) Method for Coordination of MEP. Stanford, CA: CIFE Center for Integrated Facility Engineering Technical Report, 2010, pp. 187.
3. Hartmann T. Detecting design conflicts using building information models: A comparative lab experiment. In: 27th International Conference, Cairo, Egypt, 16–19 November 2010, pp. 16–18; 2010.
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献