Affiliation:
1. College of Civil Engineering and Architecture, Wuhan University of Technology, China
2. China Construction First Building (Group) Corporation Limited, Beijing, China
Abstract
Estimation of construction waste generation is critical to construction waste management decisions. However, current construction waste estimation methods have various limitations (e.g. small samples). To address those limitations, this research conducts an empirical study to evaluate the waste generation rate of different types of waste at different construction stages. In this study, construction waste from 148 new-built residential construction sites in China were sorted and weighted on site and their waste generation rates were estimated separately. The results indicated that the amount of inorganic nonmetallic waste with a generation rate of 16.59 kg m−2 was the highest among the five types of waste (i.e. inorganic nonmetallic waste, organic waste, metallic waste, composite waste, hazardous waste), while the waste generation rate for the underground construction stage, which was 27.57 kg m−2, was the highest among the three stages (i.e. underground stage, superstructure stage, finishing stage). Compared with previous data, the new waste generation rate proposed in this research can better estimate the actual waste generation situation in construction sites, which provides reliable information for proper decision-making. Furthermore, based on the result of the empirical study, some recommendations for construction waste reduction are proposed.
Funder
the Key Projects in the National Scientific & Technology Pillar Program during the Thirteenth Five-year Plan Period
Subject
Pollution,Environmental Engineering
Cited by
27 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献