Relative train length and the infrastructure required to mitigate delays from operating combinations of normal and over-length freight trains on single-track railway lines in North America

Author:

Dick C Tyler1ORCID,Atanassov Ivan1,Kippen F Bradford1,Mussanov Darkhan1

Affiliation:

1. Department of Civil and Environmental Engineering, University of Illinois at Urbana-Champaign, Champaign, USA

Abstract

Distributed power locomotives have facilitated longer heavy-haul freight trains that improve the efficiency of railway operations. In North America, where the majority of mainlines are single track, the potential operational and economic advantages of long trains are limited by the inadequate length of many existing passing sidings (passing loops). To alleviate the challenge of operating trains that exceed the length of passing sidings, railways preserve the mainline capacity by extending passing sidings. However, industry practitioners rarely optimize the extent of infrastructure investment for the volume of over-length train traffic on a particular route. This paper investigates how different combinations of normal and over-length trains, and their relative lengths, relate to the number of siding extensions necessary to mitigate the delay performance of over-length train operation on a single-track rail corridor. The experiments used Rail Traffic Controller simulation software to determine train delay for various combinations of short and long train lengths under different directional distributions of a given daily railcar throughput volume. Simulation results suggest a relationship between the ratio of train lengths and the infrastructure expansion required to eliminate the delay introduced by operating over-length trains on the initial route. Over-length trains exhibit delay benefits from siding extensions while short trains are relatively insensitive to the expanded infrastructure. Assigning directional preference to over-length trains improves the overall average long-train delay at the expense of delay to short trains. These results will allow railway practitioners to make more informed decisions on the optimal incremental capital expansion strategy for the operation of over-length trains.

Publisher

SAGE Publications

Subject

Mechanical Engineering

Cited by 10 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Improving Short-Haul Intermodal Transit Times on Low-Density Rail Corridors with Platoons of Self-Propelled Autonomous Railcars;Transportation Research Record: Journal of the Transportation Research Board;2024-05-16

2. Analysis of the barriers to multimodal freight transport and their mitigation strategies;European Transport Research Review;2023-11-23

3. Organisation of container trains between St. Petersburg and Novorossiysk;E3S Web of Conferences;2023

4. Economically Feasible Requirements for the Appointment of Container Trains;Fundamental and Applied Scientific Research in the Development of Agriculture in the Far East (AFE-2022);2023

5. Establishment of Transportation Parameters Dependencies Determining the Economic Feasibility of Container Trains;Fundamental and Applied Scientific Research in the Development of Agriculture in the Far East (AFE-2022);2023

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3