Acceleration response of part-screw pile composite foundation under long-term train load excitation

Author:

Guan Wei12ORCID,Wu Honggang12,Pai Lifang23,Ma Zhigang4,Feng Kang4

Affiliation:

1. College of Resources and Environmental Engineering, Key Laboratory of Karst Georesources and Environment, Ministry of Education, Guizhou University, Guiyang, China

2. Northwest Research Institute Co., Ltd of C.R.E.C, Lanzhou, Gansu, China

3. School of Civil Engineering, Lanzhou Jiaotong University, Lanzhou, Gansu, China

4. Southwest University of Science and Technology of Civil Engineering and Architecture, Mianyang, China

Abstract

This paper investigates the vibration response of a new part-screw pile composite foundation under moving train loads via a model test method. Based on the acceleration signals of the pile and the surrounding soil, a non-linear fitting method is used to establish the relationship between the dynamic attenuation coefficient and the depth of the foundation. Next, the effect of spatial location and train speed on the pile-soil dynamic interaction is investigated by introducing the pile-soil spectral amplitude ratio [Formula: see text]. In addition, the dynamic susceptibility of the part-screw pile to damage under dynamic train loads is revealed with a wavelet packet energy distribution index E DIS. Afterwards, the cumulative deformation evolution characteristics of screw pile composite foundations under long-term train loading were revealed using the frequency domain integration method. The results of this work reveal that the faster the train runs, the larger the pile-soil spectrum amplitude ratio and the more prominent the ‘dynamic concentration effect’ of the part-screw pile. The change in cross-section of the part-screw pile results in a sudden change in the vibration energy transmitted from the top of the pile, which makes the variable section of the part-screw pile more likely to cause dynamic damage or even deformation. The cumulative deformation evolution process of soil between part-screw piles under long-term cyclic train loading can be divided into three stages: slow change period, fluctuation rising period and stable deformation period. The research results have important reference significance for the optimization design of high-speed railway part-screw pile composite foundation and the planning of railway running speed.

Funder

Science and Technology development Project of China Railway 8th Bureau

Key R&D program of Gansu Province

Publisher

SAGE Publications

Subject

Mechanical Engineering,Mechanics of Materials,Aerospace Engineering,Automotive Engineering,General Materials Science

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3