Affiliation:
1. Leibstadt Nuclear Power Plant, Leibstadt, Switzerland
2. Ecole Polytechnique, Palaiseau, France
Abstract
Two well-known modelling approaches are in use in probabilistic risk assessment: fault tree linking and event tree linking. The question of which modelling approach is most appropriate for specific applications has been extensively, if not emotionally, debated among experts in the past two decades, addressing both modelling and quantification issues. In this article, we determine their degree of equivalence and build ‘methodological bridges’ between the two approaches from a mathematical and algorithmic perspective. We show that, under certain conditions, both modelling approaches are equivalent. Since both fault tree linking and event tree linking approaches are subject to limitations and approximations, established bridges make it possible to formulate important recommendations for probabilistic risk assessment practitioners and quantification engine developers.
Subject
Safety, Risk, Reliability and Quality
Reference17 articles.
1. NUREG/CR-2300. A guide to performance of probabilistic risk assessments for nuclear power plants. Washington DC: US Nuclear Regulatory Commission, 1983.
2. A fast BDD algorithm for large coherent fault trees analysis
3. ZBDD algorithm features for an efficient Probabilistic Safety Assessment