Planning, Tracking, and Reducing a Complex Project’s Value at Risk

Author:

Browning Tyson R.1

Affiliation:

1. Texas Christian University, Neeley School of Business, Fort Worth, TX, USA

Abstract

Uncertainty, risk, and rework make it extremely challenging to meet goals and deliver anticipated value in complex projects, and conventional techniques for planning and tracking earned value do not account for these phenomena. This article presents a methodology for planning and tracking cost, schedule, and technical performance (or quality) in terms of a project’s key value attributes and threats to them. It distinguishes four types of value and two general types of risks. The “high jumper” analogy helps to consider how high the “bar” is set for a project (its set goals) and therefore how challenging and risky it will be. A project’s capabilities as a “jumper” (to clear the bar and meet its goals) determine the portion of its value at risk (VaR). By understanding the amounts of value, risk, and opportunity in a project, project managers can design it for appropriate levels of each. Project progress occurs through reductions in its VaR: Activities “add value” by chipping away at the project’s “anti-value”—the risks that threaten value. This perspective on project management incentivizes generating results that eliminate these threats, rather than assuming that value exists until proven otherwise.

Publisher

SAGE Publications

Subject

Management of Technology and Innovation,Strategy and Management,Business and International Management

Cited by 31 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3