Project scheduling inevitably involves uncertainty. The basic inputs (i.e., time, cost, and resources for each activity) are not deterministic and are affected by various sources of uncertainty. Moreover, there is a causal relationship between these uncertainty sources and project parameters; this causality is not modeled in current state-of-the-art project planning techniques (such as simulation techniques). This paper introduces an approach, using Bayesian network modeling, that addresses both uncertainty and causality in project scheduling. Bayesian networks have been widely used in a range of decision-support applications, but the application to project management is novel. The model presented empowers the traditional critical path method (CPM) to handle uncertainty and also provides explanatory analysis to elicit, represent, and manage different sources of uncertainty in project planning.
Subject
Management of Technology and Innovation,Strategy and Management,Business and International Management
Cited by
60 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献