Affiliation:
1. Department of Industrial Engineering, Hanyang University, Seoul, Republic of Korea
Abstract
Disassembly levelling is to determine disassembly structures that specify components to be obtained from end-of-use/life products, and disassembly lot-sizing is to determine the timing and quantity of disassembling end-of-use/life products to satisfy the demands of their components. As an extension of the previous studies that consider them separately, this study integrates the two problems, especially in the form of multi-period model. Particularly, this study considers a generalized integrated problem in which disassembly levels may be different for the products of the same type. To describe the problem mathematically, we develop an integer programming model that minimizes the sum of setup, operation and inventory holding costs. Then, due to the problem complexity, a heuristic algorithm is proposed that consists of two phases: (a) constructing an initial solution using a priority-based greedy heuristic and (b) improving it by removing unnecessary disassembly operations after characterizing the properties of the problem. To show the performance of the heuristic algorithm, computational experiments were performed on various test instances and the results are reported.
Funder
National Research Foundation of Korea
Subject
Industrial and Manufacturing Engineering,Mechanical Engineering
Cited by
26 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献