Affiliation:
1. School of Industrial Engineering, College of Engineering, University of Tehran, Iran
2. Department of Industrial Engineering, Iran University of Science and Technology, Iran
Abstract
The surgery ward is the most expensive and profitable section of a hospital. The decisions made in this section therefore produce significant effects on the overall performance of the hospital. Planning and scheduling of the surgeries in the operating rooms would obviously lead to the enhancement of the performance of the operating rooms. The setup time of the operating rooms is a very important factor in initiating next surgeries and consequently in the scheduling of elective patients. The preparation time is usually affected by the sequence of the surgeries, especially in critical and longer surgeries, such as open-heart surgeries. In this study, a two-stage procedure is applied to improve the performance of the open-heart surgical department. In the first stage, a mathematical model is proposed for planning and scheduling of the surgeries in the open-heart surgery ward, considering the sequence-dependent setup times. In the next stage, an estimation of the optimum number of intensive care unit beds is provided using the discrete event simulation method. Finally, using a real-life example, the applicability of the proposed model is demonstrated and an analysis of the effect of the recommended number of intensive care unit beds—extracted from the simulation model—on the performance of the surgical theater is performed.
Funder
University of Tehran
Iran National Science Foundation
Subject
Computer Graphics and Computer-Aided Design,Modeling and Simulation,Software
Cited by
23 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献