Improving Business Processes in a Construction Project and Increasing Performance by Using Target Costing

Author:

Oncioiu Ionica1ORCID,Căpuşneanu Sorinel2,Topor Dan Ioan3,Ifrim Ana Maria1,Silvestru Ramona Camelia4,Toader Monica Ioana3

Affiliation:

1. Titu Maiorescu University, Bucharest, Romania

2. Dimitrie Cantemir Christian University, Bucharest, Romania

3. “1 Decembrie 1918” University of Alba-Iulia, Romania

4. Technical University of Civil Engineering of Bucharest, Romania

Abstract

This article demonstrates, on one hand, how organizations are able to optimize their business processes to streamline their activities and, on the other hand, how performance can be enhanced by using the target cost method in a construction project. Based on the analysis of national and international literature, the authors carried out a quantitative and qualitative study based on a questionnaire containing a set of four questions aimed at highlighting the issues mentioned in the launched objectives. Business process-specific steps in a construction project are described and analyzed. The case study outlines how to optimize business processes by using Swimlane charts and how to reduce operating costs by applying the target cost method. The article concludes with our conclusions about the real benefits of optimizing business processes in a construction project by using the target cost method and increasing the performance of entities in this field.

Publisher

SAGE Publications

Subject

General Social Sciences,General Arts and Humanities

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3