Transfer of Production Planning and Scheduling from Staff to Production Personnel in a Complex Maintenance Company
-
Published:2000-07
Issue:10
Volume:44
Page:239-242
-
ISSN:2169-5067
-
Container-title:Proceedings of the Human Factors and Ergonomics Society Annual Meeting
-
language:en
-
Short-container-title:Proceedings of the Human Factors and Ergonomics Society Annual Meeting
Affiliation:
1. Division of Industrial Ergonomics Linköpings universitet SE-581 83 Linköping, Sweden
Abstract
In decentralized production organizations based on target-oriented production teams, production scheduling is often transferred from staff to the production teams, which may influence how the work tasks are carried out. The objectives of this case study was to gain understanding of why and how the production scheduling process was changed in a company that introduced production teams with increased responsibility for scheduling. A second objective was to analyze the demands that were made on the production scheduling system from the production teams to be able to fulfill their work requirements. Conclusions drawn were that a change in production scheduling was necessary if the production teams were to fulfill the demands put on them and that production through the decentralization was empowered to demand such change. The change of production scheduling included development of manual scheduling sheets, which proved to be successful in terms of meeting the production teams' needs for reliable production data and visualized production status.
Publisher
SAGE Publications
Subject
General Medicine,General Chemistry
Reference4 articles.
1. Berglund M. (1998). On White-Collar Work Close to Production, licentiate thesis, LiU-Tek-Lic- 1998: 53, Linköpings universitet.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Personnel Assignment from a Human Factors Perspective;Proceedings of the Human Factors and Ergonomics Society Annual Meeting;2003-10