Minimizing Total Completion Time, Total Earliness Time, and Maximum Tardiness for a Single Machine scheduling problem

Author:

Kalaf Bayda Atiya,Nagham Muosa Neamah ,Khalifa Hamiden Abd El-Wahed

Abstract

Machine scheduling problems (MSP) are     considered as one of the most important classes of combinatorial optimization problems. In this paper, the problem of job scheduling on a single machine is studied to minimize the multiobjective and multiobjective objective function. This objective function is: total completion time, total lead time and maximum tardiness time, respectively, which are formulated as  are formulated. In this study, a mathematical model is created to solve the research problem. This problem can be divided into several sub-problems and simple algorithms have been found to find the solutions to these sub-problems and compare them with efficient solutions. For this problem, some rules that provide efficient solutions have been proved and some special cases have been introduced and proved since the problem is an NP-hard problem to find some efficient solutions that are efficient for the discussed problem 1// and good or optimal solutions for the multi-objective functions 1// ,, and emphasize the importance of the dominance rule (DR), which can be applied to this problem to improve efficient solutions.

Publisher

College of Education for Pure Science (Ibn Al-Haitham)

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3