Optimization of the Load of Production Units of the Construction Company
Author:
Voitovych Vladyslav1, Emelianova Olena1, Tytok Viktoriya2, Pokolenko Vadym1, Pylypchuk Olha1
Affiliation:
1. Department of Organization and Construction Management, Faculty of Civil Engineering, Kyiv National University of Construction and Architecture, 31 Povitroflotskyi Prospect, 03037, Kyiv, UKRAINE 2. Department of Construction Economics, Faculty of Civil Engineering, Kyiv National University of Construction and Architecture, 31 Povitroflotskyi Prospect, 03037, Kyiv, UKRAINE
Abstract
The aim of the work is to develop a methodology for optimizing the work schedule under the production program of the construction company. The sample was selected based on deterministic mathematical methods and modelling. In particular, the method of processing expert opinions (method of expert evaluation) is used in this study to assess the actual degree of influence of each of the factors and its group on production indicators of the construction company. Methods of organizational and technological modelling, elements of systems theory, elements of systematics, construction system engineering were also used. A method of building and optimizing the work schedule under the production program of the construction company was developed during this study. This was implemented based on the concentration and regulation of labor resources of production units at dispersed start-up complex, as well as the maximum use of internal reserves of production units. This technique ensures the development of typical optimization solutions aimed at balanced resource consumption and effective fulfillment of the terms of construction contracts. Prospects for further research are based on the development of software in compliance with the presented methodology.
Publisher
World Scientific and Engineering Academy and Society (WSEAS)
Subject
Computer Science Applications,Information Systems
Reference16 articles.
1. Bascoul, A. M., Tommelein, I. D., Douthett, D. Management of Daily Construction Site Space Use, Frontiers in Built Environment, Vol. 6, 2020, https://doi.org/10.3389/fbuil.2020.00139 2. Prokopenko, O., Kurbatova, T., Khalilova, M., Zerkal, A., Prause, G., Binda, J., Berdiyorov, T., Klapkiv, Y., Sanetra-Półgrabi, S., Komarnitskyi, I. Impact of investments and R&D costs in renewable energy technologies on companies’ profitability indicators: Assessment and forecast. Energies, Vol. 16, No. 3. 2023. DOI: https://doi.org/10.3390/en16031021. 3. Qurratulain, M., Abdur, N., Rabiah, M., Jamaluddin, T. M., Fahim, U., Ahmad, K. K. I., Muhammad, H. BIMp-Chart-A Global Decision Support System for Measuring BIM Implementation Level in Construction Organizations, Sustainability, Vol. 13, 2021, pp. 92, DOI: https://doi.org/10.3390/su13169270. 4. Musa, S., Marshall-Ponting, A., Shahron, S., Nifa, F. A. Building Information Modeling (BIM) Benefits and Challenges: Malaysian Construction Organization Experience, Journal of Computational and Theoretical Nanoscience, Vol. 16, 2019, pp. 4914-4924, DOI: https://doi.org/10.1166/jctn.2019.8542. 5. Hrebennikova, A., Artemchuk, L., Nahornyi, V., Daliak, N., Ruban, O. Assessment of the network interaction synergistic effect according to the organization life cycle, Journal of Eastern European and Central Asian Research, Vol. 8, No. 3, 2021, pp. 311- 323. DOI: https://doi.org/10.15549/jeecar.v8i3.754.
|
|