Time-tracking tests and interpretation for a horizontal well at different wellbore positions

Author:

Nie Ren-Shi1,Ou Jin-Jing1,Wang Su-Ran2,Deng Qi1,Qin Ming3,Jia Jin-Wei3,Wang Yi-Min1

Affiliation:

1. Southwest Petroleum University, State Key Laboratory of Oil & Gas Reservoir Geology and Exploitation, Chengdu, China..

2. China University of Petroleum-Beijing, Beijing, China..

3. Xinjing Oilfield Company, Research Institute of Exploration and Development, PetroChina, Karamay, China..

Abstract

We have developed a time-tracking test method for pressure buildup tests of horizontal wells to reduce the costs associated with testing wells. The time-tracking test method requires several tests that are performed chronologically from the midsection of the horizontal wellbore to the kickoff point. The purpose of time-tracking tests is to determine the production conditions of horizontal wells that allow the tests to be conducted at the kickoff point. Two horizontal wells associated within a sandstone oil reservoir were specifically chosen to determine how our time-tracking test method is to be implemented. The two wells had completely different production conditions. One had a small gas rate and a large water cut, whereas the other had a large gas rate and a small water cut. We recorded and analyzed the tested pressure data at numerous wellbore positions along the same horizontal well. Then, we interpreted the tested pressure data and compared the test results at different points along each well using the test curve shape and the interpretation parameter values. Through comparisons of the two wells, we found that the well-test curve shape and the interpretation results of tests performed above the kickoff point were completely different from those of the tests at the midsection of the horizontal wellbore under the conditions of a large gas rate and a small water cut. If a horizontal well has a small gas rate and a large water cut, the well can be tested at the kickoff point in the well using the wireline. We recommend that field petroleum engineers adopt the time-tracking test method to judge whether their horizontal wells should be tested at the kickoff point.

Funder

National Natural Science Foundation of China

Science Technology Department of the Sichuan Province

Education Department of the Sichuan Province

Fok Ying Tung Education Foundation for Young Teachers in the Higher Education Institutions of China

Publisher

Society of Exploration Geophysicists

Subject

Geology,Geophysics

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3