Abstract
A large-scale trial embankment provided with partially penetrating prefabricated vertical drains (PVD) was installed in consolidating marine clay deposits at East-Port said industrial zone project in Egypt. The trial embankment was constructed with a bottom area of 150x150m and a height of 5.5m to evaluate the efficiency of the improvement system and verify the design parameters. An intensive instrumentation system was built-up including shallow settlement indicators, vibrating wire piezometers, extensometer, and inclinometers. Two and three-dimensional finite element analyses (FE) were performed to study the effect of the preloading system provided with partially PVD in consolidating marine clay deposits. FE models were validated and showed good agreement with the field observations in terms of vertical displacement of embankment center, and lateral soil deformation beneath the embankment toe.
Publisher
African Journals Online (AJOL)
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献