1. 1) S. Tomita, T. Kobayashi, T. Ushiromura, Y. Takiuchi and M. Niizeki: Construction of natm tunnel crossing right under existing railway tunnel, Proceedings of Tunnel Engineering, JSCE, 6 (1996) 235.
2. 2) M. Karakuş and R. Fowell: An insight into the new austrian tunnelling method (natm), Proceedings of the 7th Regional Rock Mechanics Symposium, Sivas (2004).
3. 3) M. Ishimura, N. Azetsu, Y. Yamaguchi, N. Ikushima, H. Mikami and R. Wakatake: Initiatives for automation of rockbolting in mountain tunneling, 土木学会 令和3年度土木学会全国大会第76回年次学術 講演会講演概要集 (2021) VI-679.
4. 4) S. Miyamoto and Y. Tomono: Development of 6m joint rockbolt driving device, 土木学会 令和3年度土木学会全国大会第76回年次学術 講演会講演概要集 (2021) VI-904.
5. 5) K. Kawamoto, Y. Koga and S. Miyamoto: How to minimize the labor force by introducing 6m joint rockbolt driving device into the natm tunnel construction site, 土木学会令和3年度土木学会全国大会第76回年次学術講演会講演概要集 (2021) VI-905.