1. Amir, Haidar Adnan, (2007), "Using Dynamic Programming to Solve the Problem of Multiple Output Scheduling of a Single Machine for Variable Cost of Storage", Master Thesis, college of Economics and Business management , Baghdad University.
2. Bakhit, Abdul-Jabbar Khader, Batikh, Abbas Hussein, Atta, Khaled Walid, "Determining the optimal decision in the process of planning production in the use of dynamic programming method", college of Economics and Business management / Baghdad University.
3. Algerian, Safa Mohammed, (2008), "Using the methods of the Bert project schedule and the critical path in the time-cost differentiation of the completion of projects" applied study at the Technical Institute Basra,
4. Al-Janabi, Hussein Mahmoud, (2010), "Events in Operations Research", Amman, Dar Al-Hamed, First Edition.
5. Al-Jawad Khalaf Matar, (2006), "Dynamic Programming and its use in the Distribution of Investments among the Economic Sectors in Syria", Damascus University Journal of Economic and Legal Sciences, Volume (22), Issue (1).