1. Allan, S. and Evans, J. (2005), Operational Benefits of the Integrated Terminal Weather System (ITWS) at Atlanta, M.I.T.Lincoln Laboratory, Project Report ATC-320, Massachusetts Institute of Technology, Lexington,MA.
2. Allan, S., Gaddy, S., and Evans, J. (2001), Delay Causality and Reduction at the New York City Airports Using Terminal Weather Information Systems, M.I.T. Lincoln Laboratory, Project Report ATC-291, Massachusetts Institute of Technology Lexington, MA.
3. Impact of Weather Event Uncertainty upon an Optimum Ground-Holding Strategy
4. Preliminary Evaluation of Flight Delay Propagation through an Airline Schedule