1. Acknowledgements The authors were supported through contract NAS2-00062 from NASA ARC Systems Analysis branch.
2. 2nd Generation Space Transportation Architecture Level 1 Requirements, NASA Office of the Chief Engineer, August 1999 http://www.hq.nasa.gov/office/codea/codeae/docu mentg.html