1. 2Zeigler,B.,Praehofer,H.,KimT.G.,TheoryofModelingandSimulation,2ndEdition,AcademicPress,SanDiego, 2000.
2. 5Tecolote Research, Inc. (2004). Unmanned Space Vehicle Cost Model (USCM), Eight Edition. Retrieved March 1, 2010,fromAbout USCM8: https://www.uscm8.com/SiteSpecific/aboutUSCM8.asp.
3. 6TheAerospaceCorporation.(2007).ResearchandTechnology.RetrievedMarch1,2010,fromSmallSatellite Cost Model:http://www.aero.org/capabilities/sscm/index.html.