1. in the Fiscal Year 2002 time frame based on a
2. allows accurate (1-2%), high-resolution vertical
3. • The Technology Readiness Level 6 cutoff date shall be no later than Dec 2006.
4. trajectory are as follows: Launch Vehicle: Delta IV M (4450-14) Launch C3: 8.6 km2/sec2