Author:
Altaf Mohammed Sadiq,Liu Hexu,Al-Hussein Mohamed,Yu Haitao
Cited by
10 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Digital twin for production estimation, scheduling and real-time monitoring in offsite construction;Computers & Industrial Engineering;2024-05
2. Online simulation at machine level: a systematic review;The International Journal of Advanced Manufacturing Technology;2024-02-05
3. Digitalization-based process improvement and decision-making in offsite construction;Automation in Construction;2023-11
4. Methodology to estimate logistics costs for vertically transported prefabricated wall panels;Journal of Computational Design and Engineering;2022-06-20
5. Implementation of a Digital Twin Framework in the Modular Housing Industry;2022 IEEE 28th International Conference on Engineering, Technology and Innovation (ICE/ITMC) & 31st International Association For Management of Technology (IAMOT) Joint Conference;2022-06-19