A Two-Stage Stochastic Distribution Network Restoration Model with Waste Incineration Power Plants as Black-Start Power Resources
Author:
Affiliation:
1. State Grid Corporation of China,Shanghai Electric Power Research Institute,Shanghai,China
2. Hohai University,College of Energy and Electrical Engineering,Nanjing,China
Publisher
IEEE
Link
http://xplorestaging.ieee.org/ielx7/9783222/9783223/09784102.pdf?arnumber=9784102
Reference11 articles.
1. Incorporating Wind Energy in Power System Restoration Planning
2. Technological review on enhancing the energy efficiency of MSW incineration plant
3. Linear Current Flow Equations With Application to Distribution Systems Reconfiguration
4. Coordination of Wind Farm and Pumped-Storage Hydro for a Self-Healing Power Grid
5. Multi-Time Step Service Restoration for Advanced Distribution Systems and Microgrids
Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Challenges with the Black Start Capability of Hydro Units while Upgradation of Transmission Lines;2023 IEEE Industry Applications Society Annual Meeting (IAS);2023-10-29
2. Power System Recovery Coordinated with (Non-)Black-Start Generators;2023 IEEE Power & Energy Society General Meeting (PESGM);2023-07-16
1.学者识别学者识别
2.学术分析学术分析
3.人才评估人才评估
"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370
www.globalauthorid.com
TOP
Copyright © 2019-2024 北京同舟云网络信息技术有限公司 京公网安备11010802033243号 京ICP备18003416号-3