Affiliation:
1. Fermi National Accelerator Laboratory, Batavia, IL, USA
Funder
U.S. Department of Energy
Office of Science
High Energy Physics
US HL-LHC Accelerator Upgrade Project
Publisher
Institute of Electrical and Electronics Engineers (IEEE)
Subject
Electrical and Electronic Engineering,Condensed Matter Physics,Electronic, Optical and Magnetic Materials
Reference11 articles.
1. AUP first pre-series cryo-assembly design production and test overview;Feher;IEEE Trans. Appl. Supercond.
2. Fermilab’s horizontal test stand upgrade overview and commissioning
3. Quench performance of the first pre-series AUP Cryo-Assembly;Baldini;IEEE Trans. Appl. Supercond.
4. Acceptance criteria part A: MQXFA magnet;Carcagno,2018
5. Field Quality of the 4.5-m-Long MQXFA Pre-Series Magnets for the HL-LHC Upgrade as Observed During Magnet Assembly
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献