1. Analysis of availability of a 750 kV transmission line with a pre-stranded overhang [J];Yue;Electric Power Construction,2005
2. Discussion on Mechanical Load Design Method of Prestranded Overhang Clamp [J];Zhen;China Metal Bulletin,2018
3. Fracture Analysis of pre-stranded overhanging wire Clip for ±800 kV transmission lines [J];Chun;Hunan Electric Power,2017
4. Analysis and Research of Overhang Clamp Wear Based on Finite Element [J];Yaning;Yunnan Electric Power Technology,2017
5. Finite element model of the contact between a vibrating conductor and a suspension clamp