Review on the regulation capability of multiple generation resources and suggestions for generation-side flexibility improvement

Author:

Zhang Si1,Tao Yufeng2,Li Yang1,Sun Shijie3,Yin Xunhu3,Chen Hongxin3

Affiliation:

1. State Grid Zhejiang Electric Power Co. Ltd,Hangzhou,China

2. State Grid Zhejiang Electric Power Co. Ltd,Lishui Power Supply Company,Hangzhou,China

3. Zhejiang University,College of Electrical Engeneering,Hangzhou,China

Publisher

IEEE

Reference9 articles.

1. A research summary on combined peaking load strategies of nuclear power plant[J];zhang;Advanced Materials Research,2014

2. Discussion on participation of large-scale PWR nuclear power units in power system intermediate load peak shaving;ma;Shandong electric power technology,2007

3. The role of Zhougong pumped storage power station in peak regulation and accident response in Beijing-Tianjin-Tangshan power system;he;Power System Technology,2006

4. Research on nuclear power units participating in power system peak shaving and joint operation with pumped storage power station;zhao;Proceedings of the Chinese Society of Electrical Engineering,2011

5. Research on peak shaving of UHV power in Zhejiang Power System;mao;Zhejiang Electric Power,2014

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3