Abstract
The superconducting magnet, cryogenics, and detector systems of the AMS experiment was fully integrated and tested in test beam at CERN during 2009. In Spring 2010 the experiment underwent thermal vacuum tests at ESTEC, where it was operated in conditions simulating those that will pertain in orbit. All elements of the superconducting magnet and cryogenics performed as designed, and equilibrium operation was attained at several values of vacuum case temperature. Details of the tests are presented. A thermal model of the overall cryogenic system was calibrated from those measurements. The model was used to predict the cryogenic lifetime of the experiment, as it would be staged on ISS, to be (28 ± 6) months.
Funder
U.S. Department of Energy
Publisher
Institute of Electrical and Electronics Engineers (IEEE)
Subject
Electrical and Electronic Engineering,Condensed Matter Physics,Electronic, Optical and Magnetic Materials
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献