Abstract
In the process of tunnel construction, data on deformation monitoring magnifies the direct reflection of the stability of tunnel structure, and the setting of early warning value is more related to the safety of project construction. In this paper, a tunnel project is taken as an example, and based on a large number of previous engineering practices and the statistical characteristics of monitoring data, the probability statistics method is used to obtain the warning threshold, which is used to give suggestions for the construction of the tunnel project and provide technical reference for the monitoring and warning management of similar tunnel construction.
Publisher
Frontier Scientific Publishing Pte Ltd
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献