Author:
Lukito Indro,Pambekti Arif,Budiono Cyrilus Sukaca
Publisher
Institut Teknologi Dirgantara Adisutjipto (ITDA)
Reference10 articles.
1. G. Ngurah, W. Hermawan, and D. D. Widyastuti, "Peranan apron movement control dalam melayani pergerakan pesawat udara charter di bandara halim perdanakusuma," pp. 61-70.
2. J. O. Brunner, "Rescheduling of flights during ground delay programs with consideration of passenger and crew connections," Transp Res E Logist Transp Rev, vol. 72, 2014, doi: 10.1016/j.tre.2014.10.004.
3. L. Fatchiyah and E. Ahyudanari, "Analisis dampak delay yang terjadi pada runway, apron dan ruang udara terhadap operasional pesawat (studi kasus: bandara internasional juanda)," ITS journal of civil engineering, vol. 32, no. 2, nov. 2017.
4. M. S. Ryerson, M. Hansen, and J. Bonn, "Time to burn: Flight delay, terminal efficiency, and fuel consumption in the National Airspace System," Transp Res Part A Policy Pract, vol. 69, 2014, doi: 10.1016/j.tra.2014.08.024.
5. M. C. Gelhausen, P. Berster, and D. Wilken, "Do airport capacity constraints have a serious impact on the future development of air traffic?," J Air Transp Manag, vol. 28, 2013, doi: 10.1016/j.jairtraman.2012.12.004.