Affiliation:
1. School of the Built Environment University of Salford, UK
Abstract
Construction management, as an emergent field of research, is yet to have a recognized methodological orientation, characteristic of other more established domains, and therefore builds on the traditional philosophical assumptions of related natural and social science research. The term “Methodological pluralism,” has thus been used to describe the use of a multiplicity of philosophies and methods, compatible with the study of construction phenomena. This study narrows down the philosophical argument in construction management to within the specific domain of cost overrun research, to systematically articulate the shortcomings in the methodological/philosophical tradition embraced by previous studies. Empirical profiling of cost overrun research reveals the predominance of mono-method studies based on questionnaire survey methods, correlative analysis, and archival data modeling techniques, all of which are underlain by positivism. The study argues that such positivist philosophies, although methodologically valid, cannot adequately explain and provide an in-depth understanding of the contextual drivers in construction organizations, that trigger the more tangible technical constructs, leading to the phenomena of cost growth in projects. Joining in the chorus call for methodological pluralism in construction industry research, this study makes a case for critical realism specifically in the context of cost overrun research.
Reference40 articles.
1. Ahiaga-Dagbui, D. D., and S.D. (2014). Rethinking construction cost overruns: Cognition, learning and estimation. Journal of Financial Management of Property and Construction, 19(1),38–54.
2. Aibinu, A.A., and Odeyinka, A. (2006). Construction delays and their causative factors in Nigeria. Journal of Construction Engineering Management, ASCE, (132) 7,667-677.
3. Akoa, B.B. (2011). Cost Overruns and Time Delays in Highway and Bridge Projects – Experiences from Cameroon. An unpublished Master’s thesis submitted to Michigan State University.
4. Allahaim, F. D., and Liu, L. (2013). Understanding Major Causes Cost Overrun for Infrastructure Projects; A Typology Approach. Annual Conference of the Australasian Universities Building Educators Association (AUBEA)The University of New South Wales, Australia
5. An, S., Kim, G., and Kang, K. (2007). A case-based reasoning cost estimating model using experience by analytic hierarchy process. Journal of Building and Environment. 42(7), 2573–2579.
Cited by
1 articles.