1. Integration of mechanical water finding and plugging string;Li;Process String China Petroleum Machinery,2007
2. WDP technology without pulling the strings for horizontal wells;Kong;Petroleum Geology & Oilfield Development in Daqing,2016
3. Integrated technique for hydrophobic-lipophilic water finding and plugging;Zhu;Petroleum Geology & Oilfield Development in Daqing,2017
4. Lin, W. (2016). Simulated study on workover string dynamics in workover operations of highly-deviated well (Mater Thesis). Southwest Petroleum University, China.
5. Simulation study on affect factors of workover string buckling in horizontal well;Lin;Journal of Mechanical Strength,2017