Identifying and Developing Prerequisites for Takt Planning in a BIM-Based Construction Process

Author:

Ljung Efraim1,Viklund Tallgren Mikael2ORCID,Roupé Mattias2ORCID,Johansson Mikael2ORCID

Affiliation:

1. Skanska AB, SE

2. Chalmers University of Technology, SE

Abstract

The construction industry is undergoing a significant shift in how design and production are conducted. Building Information Modeling (BIM) has emerged as a key tool for coordinating information from all involved disciplines and providing a more holistic view of the construction process. However, effective coordination and communication between different professions remain major challenges that require new approaches to project management. Takt planning has gained increasing attention as a potential solution to improve traditional planning methods. Despite this, there is a lack of real-world studies exploring BIM and takt planning where information is structured according to takt planning. A takt planning structure for all BIM-models would bring a more holistic understanding of what is to be done, controlled, and reported back. To address this gap, this paper presents findings from a three-stage research process. Firstly, form a focus group of disciplines to find a shared structure to present the execution in a common way for design and construction in a lab environment at a conceptual level, secondly implementing it to the detailed design information for real -world case project in workshops and group meetings with the focus group and then thirdly, evaluate it in the case project with the site staff involved. The findings highlight the importance of a shared denominator to get a holistic approach to project management and enabling takt planning throughout all phases of construction, providing insights into its practical application and benefits for the construction industry

Publisher

Firenze University Press

Reference20 articles.

1. Azhar, S. (2011). Building information modeling (BIM): Trends, benefits, risks, and challenges for the AEC industry. Leadership and Management in Engineering, 11(3), 241–252.

2. Building Information Modeling: Why? What? How?

3. Integration of Cost and Work Breakdown Structures in the Management of Construction Projects

4. Impacts of 4D BIM on construction project performance

5. Disney, O., Johansson, M., Domenico Leto, A., Roupé, M., Sundquist, V., & Gustafsson, M. (2021). Total BIM Project: The future of a digital construction process. Industry 4.0 Applications for Full Lifecycle Integration of Buildings, 21–30. https://research.chalmers.se,

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3