Abstract
The proposed development of Sibu Central hinges on the fact that it attracts high number of visitors from all over Sarawak. The development of Sibu Central would definitely improve the surrounding areas in future as Sibu Central will be one of the landmarks for Sibu. This development therefore will automatically generate more road traffic which will affect the performance of the existing road. The performance of the existing road was evaluated by two signalized intersections surrounding the proposed development of Sibu Central. It was carried out in order to determine the current traffic volume data, upon the completion of Sibu Central and 5 years after the development was completed. The road performance of Intersection 1 and Intersection 2 was analysed by using Sidra software. It was found that the existing road was still within the satisfactory performance, as the Level of Service (LOS) was in the range of LOS A until LOS D. This was due to the current traffic volume that was still under the capacity of the existing road which also influenced the satisfactory result for Volume by Capacity (V/C) ratio, average delay and queue length of all directions in Intersection 1 and Intersection 2. This result will not be adequate as the capacity of the road still remains unchanged due to the fact that the traffic volume keeps on increasing every year. The deterioration of the existing road in Intersection 1 and Intersection 2 was established in this study based on the performance of LOS, V/C ratio, average delay and queue length.
Subject
Literature and Literary Theory,History,Cultural Studies
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献