1. [1] L. Gély, G. Dessagne, and C. Lérin: Modelling train re-scheduling with optimization and operational research techniques: results and applications at SNCF, Proceedings of World Congress on Railway Research 2006, 2006.
2. [2] Y. Nagasaki, M. Eguchi, and T. Koseki: Application of graph theory to scheduling of train operation-fundamental theory and possibility of its application to realtime train rescheduling, The Institute of Electrical Engineers of Japan Collegium Document, Technical Committee on Transportation and Electric Railway, TER-03-23, 2003.
3. [3] N. Imahashi and T. Nagata: An Optimal Train Scheduling by Using Simulated Annealing, Hiroshima Institute of Technology Annals (Researches), vol.41, pp.193-197, 2007.
4. [5] M.Takano, M.Tachiki, D.Ooyama, T.Yamaguchi, and T.Koseki: Computer Assisting System to Propose and Evaluate Train-Rescheduling with Estimating Passenger Flow, Proc. of J-Rail, vol.2003, 2003.
5. [6] A. Tomoeda, K. Nishinari, D. Chowdhury, and A. Schadschneider: An information-based traffic control in a public conveyance system: Reduced clustering and enhanced efficiency, Physica A, vol.384, pp.600-612, 2007.