Affiliation:
1. Institute for Particle Physics, ETH Zürich, Schafmattstrasse 20, 8093 Zürich, Switzerland
Abstract
The 4-tesla, 6 m free bore CMS solenoid has been successfully tested, operated and mapped at CERN during the autumn of 2006 in a surface hall and fully recommissioned in the underground experimental area in the autumn of 2008. The conceptual design started in 1990, the R&D studies in 1993, and the construction was approved in 1997. At the time the main parameters of this project were considered beyond what was thought possible as, in particular, the total stored magnetic energy reaches 2.6 GJ for a specific magnetic energy density exceeding 11 kJ/kg of cold mass. During this period, the international design and construction team had to make several important technical choices, particularly mechanical ones, to maximize the chances of reaching the nominal induction of 4 T. These design choices are explained and critically reviewed in the light of what is presently known to determine if better solutions would be possible today for constructing a new large high-field thin solenoid for a future detector magnet.
Publisher
World Scientific Pub Co Pte Lt
Subject
General Physics and Astronomy,Astronomy and Astrophysics,Nuclear and High Energy Physics
Cited by
13 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献