Evaluating the project completion time when activity networks follow beta distribution

Author:

Abdelkader Y. H.1,Barakat H. M.2,Taher T. S.2

Affiliation:

1. Department of Mathematics, Faculty of Science, Alexandria University, Alexandria, Egypt

2. Department of Mathematics, Faculty of Science, Zagazig University, Zagazig, Egypt

Abstract

By using a recursive method, we determine the project completion time when the activity times are distributed according to a beta distribution. The [Formula: see text]th moment of the maximum of non-identical independent random variables following this distribution-type is evaluated. Applicability and appropriateness of the beta model are illustrated by some examples, which show that the suggested estimate program evaluted and review technique of the project completion time is located between the lower bound estimate (PERT) and the upper estimate that was obtained by Kambarowski An upper bound on the expected completion time of PERT networks, Eur. J. Oper. Res. 21(2) (1985b) 206–212. Moreover, this estimate gives less values of the approximation errors than most of the other known estimates.

Publisher

World Scientific Pub Co Pte Lt

Subject

General Mathematics

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Evaluating the Project Completion Time When Non-Identical Beta Distributions Govern the Activity Networks;American Journal of Mathematical and Management Sciences;2020-09-01

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3