Affiliation:
1. Department of Business Administration, Aichi Institute of Technology, Toyota 470-0392, Japan
2. College of Economics and Management, Nanjing University of Aeronautics and Astronautics, Nanjing 211106, P. R. China
Abstract
The random age replacement policies discussed in literatures are helpful to complete the nonstopping works with random working cycles, however, maintenance policies are more easily performed at periodic times in real applications. For such a viewpoint, this paper proposes that age replacement policies are planned at periodic times while considering the random working cycles. Using the modeling approaches of replacement first and last policies, we discuss two models such that the unit is replaced at periodic times [Formula: see text] and working cycles [Formula: see text], whichever occurs first and whichever occurs last. The expected cost rate models are obtained and their optimal solutions for [Formula: see text] and [Formula: see text] are discussed. The comparisons between the policies of [Formula: see text] and [Formula: see text], and replacement first and last are made from the point of cost. Numerical examples are illustrated when the failure time has a Weibull distribution.
Publisher
World Scientific Pub Co Pte Lt
Subject
Electrical and Electronic Engineering,Industrial and Manufacturing Engineering,Energy Engineering and Power Technology,Aerospace Engineering,Safety, Risk, Reliability and Quality,Nuclear Energy and Engineering,General Computer Science
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献