Affiliation:
1. Department of Statistics, M.D. University, Rohtak-124001, Haryana, India
Abstract
The purpose of the present study is to determine reliability measures of a two-unit cold standby system with preventive maintenance and repair. The units are identical in nature subject to constant failure from normal mode. Preventive maintenance of the operative unit is carried out after a pre-specific time "t" up to which no failure occurs. However, repair of the unit is done at its failure. The unit works as new after repair and preventive maintenance. The switch devices are perfect. The distributions of failure time and the time by which unit undergoes for preventive maintenance are taken as negative exponential while that of preventive maintenance and repair times are assumed as arbitrary with different probability density functions. The random variables associated with failure, preventive maintenance and repair times are statistically independent. The semi-Markov process and regenerative point technique are adopted to derive the expressions for system performance measures in steady state. The graphical behavior of MTSF, availability and profit function have been observed with respect to preventive maintenance rate for particular values of other parameters and costs.
Publisher
World Scientific Pub Co Pte Lt
Subject
Electrical and Electronic Engineering,Industrial and Manufacturing Engineering,Energy Engineering and Power Technology,Aerospace Engineering,Safety, Risk, Reliability and Quality,Nuclear Energy and Engineering,General Computer Science
Cited by
8 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献