Affiliation:
1. Indian Institute of Technology, Bombay, Mumbai, India
2. Defence Institute of Advanced Technology (Deemed University), Girinagar, Pune, India
Abstract
Systems, sub systems and components of large engineering plants are grouped into Higher Modular Assemblies (HMA), all of which will need to be operational for the plant to be available. However, each HMA could have different intervals and durations for maintenance based on their different physical and functional characteristics resulting in narrow windows of plant operational periods. The problem of scheduling maintenance of large systems have been studied in literature in a limited way from this perspective and in practice, the management of the issue involves elements of subjectivity, sub-optimality and lack of adequate sensitivity analysis. The present paper views the initial scheduling of preventive maintenance as a constrained non linear multi-objective decision making problem. The objectives of reliability, cost and newly introduced criteria, non-concurrence of maintenance periods and maintenance start time factor are simultaneously optimized. The solution enables the decision maker to make a balanced choice of maintenance intervals which provide larger operational periods. The optimization problem is solved using an elitist GA and maintenance domain knowledge is effectively incorporated in its implementation.
Publisher
World Scientific Pub Co Pte Lt
Subject
Electrical and Electronic Engineering,Industrial and Manufacturing Engineering,Energy Engineering and Power Technology,Aerospace Engineering,Safety, Risk, Reliability and Quality,Nuclear Energy and Engineering,General Computer Science
Cited by
17 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献