Affiliation:
1. School of Traffic and Transportation, Beijing Jiaotong University, Beijing 100044, P. R. China
2. School of Economics and Management Engineering, Beijing University of Civil Engineering and Architecture, Beijing 100044, P. R. China
Abstract
Railway capacity has been extensively investigated for the purpose of utilizing rail infrastructure in a possible efficient strategy. Nevertheless, the estimation of high speed rail (HSR), which is different from common railways in many aspects, is still a challenge work needed to be solved. Consequently, this work focuses on the capacity estimation of HSR corridor. The objectives and constraints are developed for the HSR with the consideration of passenger service level and buffer time uncertainty, and a two-stage optimization model is proposed. The first stage determines the optimal number of trains in terms of the passenger origin–destination demand, and the second stage is a multi-objective mixed integer programming (MO-MIP) aiming to estimate the optimal capacity usage. The branch-and-bound algorithm is extended and applied to the proposed model, and a case study is performed to Beijing–Shanghai HSR line. The optimal solution is obtained, and the sensitivity of the two objectives is analyzed.
Funder
The Ministry of Transport Construction Projects in Science and Technology
Publisher
World Scientific Pub Co Pte Lt
Subject
Computer Science Applications,Modeling and Simulation
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献