Intelligent engineering management modeling for computer technology and data mining

Author:

Feng Ning1,Shabaz Mohammad2,Elashiri Mohamed A.3,Arias-Gonzáles José Luis4,Chaudhury Sushovan5,Al-Masoudy Miami Abdul Aziz6,Oyebode Oluwadare Joshua7

Affiliation:

1. School of Management, Henan University of Urban Construction, Pingdingshan, Henan 467036, P. R. China

2. Model Institute of Engineering and Technology, Jammu, J&K, India

3. Computer Science Department, Faculty of Computers & Artificial Intelligence, Beni-Suef University, Beni-Suef, Egypt

4. Pontifical Catholic University of Peru, 1801 Universitaria Avenue, San Miguel, Lima, Peru

5. Department of Computer Science and Engineering, University of Engineering and Management, Kolkata, West Bengal 700160, India

6. Medical Instrumentation Techniques Engineering Department, AL-Mustaqbal University College, Babylon, Iraq

7. Civil and Environmental Engineering, Afe Babalola University Ado-Ekiti, Ekiti State, Nigeria

Abstract

The author suggests using computer technology and data mining in intelligent engineering management to increase the management capacity of engineering projects and decrease the consumption of construction expenses. The emphasis is mostly on theoretical and analytical approaches to problems of practical concern for data mining, perhaps in combination with other conventional tools, and the associated applications to engineers and managers of various industrial sectors. This has immediate benefits for both academic and applied data mining researchers as well as research students. The author developed a BIM project management system based on Browser/Server architecture and Client/Server architecture in conjunction with BIM technology and the BIM 4D model. To execute complete project management of business management, real-time control, and decision support, the system must establish and use its business logic and data exchange link. Each module in the 4D construction dynamic management subsystem recognizes dynamic management of the construction process, and the working duration of each module is determined by calculating by using the unified engineering decomposition principle, rationalizing the relevant data through time parameters, recording the acquired management data and storing it in the BIM database, and connecting the BIM database bi-directionally through the web server through the system integration. The results showed that when the time is 20[Formula: see text]min, the throughput of the system is higher than [Formula: see text][Formula: see text]kb/s. The system can effectively improve the project management ability, reduce the construction cost and construction period of the project, and the system responds quickly.

Publisher

World Scientific Pub Co Pte Ltd

Subject

Computer Science Applications,Modeling and Simulation,General Engineering,General Mathematics

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Guest Editorial: Modeling and simulation based intelligent embedded computing systems in industrial internet of things;International Journal of Modeling, Simulation, and Scientific Computing;2024-04

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3