Affiliation:
1. Department of Industrial Engineering, Shahed University, Tehran, Iran
Abstract
Nowadays most of the organizations tend to outsource their projects. In these cases, two major problems arise: project selection and contractor selection. There are many papers which have argued separately about project and contractor selections. In this paper, we propose a decision support system for selecting projects and related contractors. The proposed approach contains three phases including contractors' prequalification (Phase 1), computing success coefficient of each contractor in projects using fuzzy TOPSIS method (Phase 2), and selecting projects and assigning each project to the most appropriate contractor using a linear programming model (Phase 3). Finally, a numerical example is illustrated to show the application of the proposed method.
Publisher
World Scientific Pub Co Pte Lt
Subject
Management of Technology and Innovation
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献