Affiliation:
1. School of Public Administration, Shandong Technology and Business University, No. 191 Binhai Middle Road, Laishan District, Yantai City 264005, Shandong Province, P. R. China
Abstract
This paper systematically constructs a multi-project and a multi-objective human resource scheduling mathematical model in construction projects and puts forward an improved genetic algorithm to solve it by aiming at the problems existing in the process of human resource scheduling and optimization. Specifically, first, the basic mathematical models of GPRs and resource-constrained construction project human resource scheduling problem (RCWSP/GPRs) are established, and the multi-project equilibrium problem is extended. Then, an improved inter-cluster separation (ICS) algorithm is proposed and used to solve the RCWSP/GPRs problem. Finally, on this basis, the mathematical model of multi-project and multi-objective human resource scheduling problem and the solution method based on multi-objective-integrated circuit are proposed. At the same time, the resource-constrained multi-project and multi-skill human resource scheduling problem and the integer programming mathematical model under the generalized priority relationship are proposed. Also, the simulation results verify the accuracy of the proposed algorithm and model.
Funder
Social Science Planning Project of Shandong Province, The Occurrence Mechanism and Solving Mechanism of Labor and Capital Group Events in Shandong
Publisher
World Scientific Pub Co Pte Ltd
Subject
Electrical and Electronic Engineering,Hardware and Architecture,Electrical and Electronic Engineering,Hardware and Architecture
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献