1. Akbal, B., 2018, “Applications of artificial intelligence and hybrid neural network methods with new bonding method to prevent electroshock risk and insulation faults in high-voltage underground cable lines”, Neural Comput & Applic, Cilt: 24, Sayı: 2, ss. 32-36.
2. Alex J. S., Bernhard, S., 2004, “A tutorial on support vector regression” Statistics and Computing, Cilt: 14, ss. 199–222.
3. Bak, C., L., Silva, F., F. 2016. “High voltage AC underground cable systems for power transmission – A review of the Danish experience, part 1.” Electric Power Systems Research, Cilt: 140, ss. 984-994.
4. Bak, C., L., Silva, F., F. 2016. “High voltage AC underground cable systems for power transmission – A review of the Danish experience, part 2.” Electric Power Systems Research, Cilt: 140, ss. 995-1004.
5. Benato, R., Balanuye, I., Köksal, F., Ozan, N., Özdemirci, E. 2017.“A 4 GW AC submarine Turkish power grid reinforcement under the Dardanelles Strait”,IEEE 2017 AEIT International Annual Conference, Cagliari, Italy ss. 1-6.